This Blog is about the design and building of one of the first Passive House projects in Toronto. We are converting a 60 year old Bungalow in to a 2 storey House with a 2 nd suite. Using all the design aspects of the German standard for a Passive House.
Friday, April 1, 2011
A super Insulated House and a very poor insulated House.
Massive heat lost on windows and through walls for sure not a Passive House.
No comments:
Post a Comment