This Blog is about the design and building of one of the first Passive House projects in Toronto. We are converting a 60 year old Bungalow in to a 2 storey House with a 2 nd suite. Using all the design aspects of the German standard for a Passive House.
Monday, August 15, 2011
Second Floor Walls are being Craned up to second Floor.
Ray-Core Wall Panels R 52 insulation ready for assembly
Exterior Walls are up Sheeted Wrapped all in one Day
No comments:
Post a Comment